This page is currently in the test phase. All the content you see here is for demonstration purposes only.
Suite SX3

Testflow - Short lived

The task package is designed for the development for testing of the report lifecycle with a short-lived report.

The task package is designed for the development for testing of the report lifecycle with a short-lived report.

  • The live connection to a report expires after 15 seconds.
  • The report itself is removed from the system after one minute.