Suite SX4
Testflow - Offline
The task package is designed for the development for testing of the report live/offline lifecycle.
The task package is designed for the development for testing of the report live/offline lifecycle.
- The live connection to a report expires after 10 seconds.
- The report itself is removed from the system after 1 day.