This page is currently in the test phase. All the content you see here is for demonstration purposes only.
Suite SX4

Testflow - Offline

The task package is designed for the development for testing of the report live/offline lifecycle.

The task package is designed for the development for testing of the report live/offline lifecycle.

  • The live connection to a report expires after 10 seconds.
  • The report itself is removed from the system after 1 day.